Private Sector
Office
Retail
Hospitality
Arc Flash
Central Plant
Warehouse
Parking
Worship

Government
Facilities
Fueling
Airfield
Central Plant
GTP has completed short circuit and coordination studies and/or arc flash studies for over ten US embassies or consulates, multiple projects at the Atlanta Airport, multiple medical facilities, and has provided arc flash studies at existing facilities for over ten major manufacturers in Georgia.

Watergate Central Plant
Chilled Water Pump Upgrade

Washington, DC
Mechanical and electrical design and construction administration for the conversion of the chilled water pumping system to a primary-secondary pumping system with variable frequency drives on all of the pumps. The project included a new secondary pumping skid and replacement of the existing primary pumps.
Watergate Central Plant Chiller
Replacement and Switchgear Upgrade

Washington, DC
Mechanical and electrical design and construction administration for the replacement of one of the existing 600-ton gas absorption chillers with a new 1000-ton electric chiller and the upgrade of the existing 3000-amp electrical service to two 3000-amp services with a new main-tie-main switchboard. The project also included the design and implementation of an entirely new chiller plant control and automation system.
Watergate Central Plant Boiler Feed Pump
Replacement and Cooling Tower VFD Project

Washington, DC
Mechanical and electrical design and construction administration for the replacement of three existing boiler feedwater pumps and the addition of variable frequency drives (VFDs) for the cooling towers. The project included controls upgrades for the new cooling tower VFDs.
Watergate Central Plant Chiller
Replacement and Boiler Upgrade

Washington, DC
Mechanical and electrical design and construction administration for the replacement of one of the existing 600-ton gas absorption chillers with a new 1000-ton electric chiller and the conversion of one of the existing boilers to a summer boiler.